


Chaoyang Hongda Machinery Co., Ltd in March 14, 2000 registration, located in Chaoyang City, Liaoning Province, high-hech industrial zone. Covers an area of 27000m²,construction area of 14000m²,existing staff of 158 people. Company fooers machining, welding, chain rollers, assembly, suface treatment five plants and sales, technical, production and other department offices. Products related to artificial board,paper,power generation(biomass,thermal power),ca...[Detailed]
After the close of trading on June 3rd, FTSE Russell announced the quarterly adjustment results of the index, and Weichai Power was successfully included in the FTSE China A50 i...[Detailed]
On the road to electrification of construction machinery, there is an age-old but unavoidable question: a single electric excavator or loader does indeed have zero emissions, bu...[Detailed]
On May 22, the world's first randomized controlled clinical trial of equivalent low altitude building (plateau space station), led by the Xizang Plateau Medical Research Institu...[Detailed]